Try to tease out what’s important to them, what projects they’ve tried in the past, and what they hope to see in the future. There are many ways to run a project retrospective meeting, but you should try to identify your biggest wins and losses and come up with solutions. These performance reviews can be delivered to team members (or higher-ups) in the form of an easy to read visual summary, like the one below: But remember…your project isn’t complete until all of your documents have been handed over and approved by your client or stakeholder. To an outsider, it might seem like the project management process is easy…just talking to clients, scheduling meetings, assigning tasks, and reminding team members of deadlines. Definition - during the definition phase, a project manager is assigned the project, a project team is formed and responsibilities are doled out, customer requirements are defined and project objectives are set. Venngage Business users can use the My Brand Kit and see their company colors, logos, and fonts automatically applied to Venngage templates. Equipment and materials were delivered to the work site, labour was hired and trained, a construction site was built, and all the construction activities, from the arrival of the first dozer to the installation of the final light switch, were accomplished. A project management life cycle is a five-step framework planned to assist project managers in completing projects successfully. , like the one below, will help make sure you don’t leave out any pertinent details when you’re communicating with stakeholders. Set boundaries on project scope based on your deadlines and the resources at your disposal, and think about what skill set your future team will need. The deliverable’s of each ending phase are review for the completeness in accuracy & time in the light of the specified objectives. The number and sequence of the cycle are determined by the management and various other factors like needs of the organization involved in the project, the nature of the project, and its area of application. Executing 4… As a project manager, it's up to you to decide when each of the phases gets initiated and what actions should be taken in every given moment. The project controls team also developed a detailed budget that enabled the project team to track project expenditures against the expected expenses. A project retrospective is as much about reviewing the success of the project as it is about extracting learnings that can apply to future projects. The last remaining step is to conduct lessons-learned studies to examine what went well and what didn’t. In this stage, you and your team will identify the key issues the new project will strive to sol… A project management life cycle is a framework comprising a set of distinct high-level stages required to transform an idea of concept into reality in an orderly and efficient manner. And if you monitor each, you can systematize them and understand where there’s room for improvement. It is developed by the performing organization (i.e. They’re perfect for planning and scheduling, and eventually monitoring progress throughout the execution stage of the project life cycle. go without obstacles, and there will always be things to learn that will ease the progress of other projects. The project phases may bear their own life cycle, which defines the beginning and end of each phase, although, in many projects these phases and their unique life cycles may overlap with each other. It’s how projects happen; how the phases of a project conduct a team from brief through to delivery. There was no existing infrastructure for either the mining industry or large construction projects in this part of South America. Let’s dig into the most important major deliverable of the project planning stage: the project roadmap. For example: “In 3 months, increase blog conversion rates by 5%”. The project design team built on the conceptual design and developed detailed drawings for use by the procurement team. Taken together, these phases represent the path a project takes from the beginning to its end and are generally referred to as the project “life cycle.”. Pro Tip: Use our roadmap maker to create professional, engaging roadmaps. The overview typically includes defining the reason for the project, business goals and the strategy to achieve the desired results. Pro-tip: Set S.M.A.R.T. The key project management steps for the initiation stage include: We’ve got a more detailed guide to writing a project management plan if you want more information. Each project deliverable produced should be reviewed for quality and measured against the acceptance criteria. And because it’s visual, it’s easy for you team to see, understand, and give feedback on their upcoming tasks. Life cycles offer a systematic and organised way to undertake project-based work and can be … The implementation phase represents the work done to meet the requirements of the scope of work and fulfill the charter. Throughout this step, project sponsors and other key stakeholders should be kept informed of the project’s status according to the agreed-on frequency and format of communication. Ideas that start in the back of the mind start to bubble up into potential projects. Although planning is a never-ending process on a project, the planning phase focused on developing sufficient details to allow various parts of the project team to coordinate their work and allow the project management team to make priority decisions. Framework for Project Management, Creative Commons Attribution 4.0 International License. Gantt charts (like the one below) are a great tool for project roadmapping, because they can show the duration and timing of a number of dependent tasks. In any project, a project manager spends most of the time in this step. Before the project is approved or rejected, these two documents are created to sell the work to stakeholders or sponsors: 1. Business Case: Here is where you justify the need of the project, which includes analyzing return on investment. Feasibility Study – This is an evaluation of the … Any project manager worth their salt knows that clear communication is the backbone of any successful project. Phases of the project life cycle The project life cycle consists of four crucial phases that play a lead role in helping the project manager and his team achieve goals that are set in the project. The final stage of the project management life cycle is the closure phase, which requires a series of essential tasks and activities, such as delivering the finished project to the client, communicating its completion to stakeholders, releasing resources, and terminating contractors hired specifically for the project. The major deliverables and the participating work groups are identified, and the project team begins to take shape. Learn more about My Brand Kit, Comment Mode, and more features of the Venngage Business account: Once your project proposal has been approved, it’s time to move on to the project planning stage of the project life cycle. Venngage helps you make your communication visual, so that you can wow clients and keep your team aligned. But anyone who has managed a project will tell you it’s much more than that, which is why the project life cycle is so useful. All of the details that you establish during the initiation stage should be outlined in a project proposal, the only major deliverable for this initiation stage. During the third phase, the implementation phase, the project plan is put into motion and the work of the project is performed. (specific, measurable, achievable, relevant, time-bound) goals. In this stage, management or other authority figures have determined a business need that will require the work of a project manager. The initiation lays the foundation for all future steps, all the way to the project’s closure. The best thing about using a Gantt chart for your project roadmap? The initiation stage of the project life cyclecan also be referred to as the ideation or conceptualization stage. , like the one below, can aid in identifying and assessing all of the risks in your project. The initiation stage of the project management life cycle is when you meet with clients and stakeholders to understand their goals, motivations, and hopes for the project. Keep track of your notes somewhere that will be accessible by your whole team, like a shared spreadsheet (or send out an email after the meeting): Another duty of a project manager in the project closure phase can be to analyze the performance of the team, based on the quality of their work and how well they were able to meet deadlines. With offices in place, the project start-up team began developing procedures for getting work done, acquiring the appropriate permits, and developing relationships with Chilean and Argentine partners. During the final closure, or completion phase, the emphasis is on releasing the final deliverables to the customer, handing over project documentation to the business, terminating supplier contracts, releasing project resources, and communicating the closure of the project to all stakeholders. One was in Chile, where large mining construction project infrastructure existed. The life cycle of any project can get confusing. The next phase, the planning phase, is where the project solution is further developed in as much detail as possible and the steps necessary to meet the project’s objective are planned. The project life cycle is a 4-step framework designed to help project managers guide their projects successfully from start to finish. The project itself could improve business processes, create revenue, or otherwise fill a need in the organization. Phases in life cycle of a construction project are initiation, planning, execution, performance and monitoring and closure phase of construction projects. Once your roadmap is in place, the last step of the planning stage is to assemble your team and hold a project kickoff, launching you into the next stage of the project life cycle: the execution stage. The project management life cycle is usually broken down into four phases: initiation, planning, execution, and closure—these make up the path that takes your project from the beginning to the end. Check out our job proposal templates, business proposal templates and consulting proposal templates for more options. For our purposes, this phase is covered under the execution and closure phases.To help you visualize the project management lifecycle, use this free customizable template. Create a project roadmap with project tasks and milestones. There are a lot of activities going on at different phases of a project. These four phases consist of conception/start, planning, execution/ implementation, … 2. No matter what project it is that you’re preparing for, the 5 phases of a project life cycle can assist you and your team in narrowing the project’s focus, keeping it’s objectives in order and finishing the project on time, on budget and with a minimum of headaches. Start by talking with your stakeholders or clients to get to know their needs. The project manager uses this information to maintain control over the direction of the project by comparing the progress reports with the project plan to measure the performance of the project activities and take corrective action as needed. Set boundaries on project scope based on your deadlines and the resources at your disposal, and think about. Phases of a Project Life Cycle. Before we dig deeper, let’s quickly review the project life cycle. Every project has a start and end; it’s born, matures and then “dies” when the project lifecycle is complete. There are 4 project life cycle phases: initiation, planning, execution, and closure. 2. Connect with her on LinkedIn and on Twitter @MNediger. With a handle on all of the variables at play, you can start breaking the project down into more actionable steps. When working on a report, you would start by clarifying the submission requirements and the deadline. It’s easy to edit and share with your team. This is where the majority of the project work takes place, and it requires constant monitoring. 2. Image courtesy of SIS International Research During the initiation stage, the project manager (PM) would determine an… Appendix 1: Project Management PowerPoints, The project manager and project team have one shared goal: to carry out the work of the project for the purpose of meeting the project’s objectives. PMBOK® Guide Concept of the Project Life Cycle; 5 Phases of Project Management; Phase 1: Project Initiation; Phase 2: Project Planning; Phase 3: Project Execution; Phase 4: Project Monitoring; Phase 5: Project Closure; Smartsheet for Project Management The other two were in Argentina. These are: 1. Approval is then sought by the project manager to move onto the detailed planning phase. understand the goals, priorities, deadlines, and risks of the project, outline the tasks and timeline required to execute on the project, turn your plan into action and monitor project performance, analyze results, summarize key learnings, and plan next steps, Ensure goals are achievable with the available resources, Help mitigate risk and keep projects on track, , dependencies, constraints, and priorities, based on deadlines and available resources. This is the starting point of the project. For example, this Gantt chart template shows project tasks for multiple teams over the course of a few months: The visual format of a Gantt chart makes visualizing and adjusting for dependencies much easier than a spreadsheet. Let’s take a look at what’s involved for each of these tasks. In the project closure stage of the project management process, you: A project retrospective is as much about reviewing the success of the project as it is about extracting learnings that can apply to future projects. You can also get PMP Certification to get specific training on how to do this. Using this meeting … The four Project Management Processes are: Starting or initiation process – this establishes the outline definition and business case for the project, including the basic team design. Characteristics of Project Life Cycle Following are the important characteristics of project life cycle. This chapter of Project Management is a derivative the following texts: Project Management by Adrienne Watt is licensed under a Creative Commons Attribution 4.0 International License, except where otherwise noted. Initiation: The first stage where you figure out the 'why' of the project's existence. The accounting books were reconciled and closed, final reports written and distributed, and the project manager started on a new project. The Project Management Life Cycle has four phases: Initiation, Planning, Execution and Closure.Each project life cycle phase is described below, along with the tasks needed to complete it. For example, this status report includes an overview of project performance so far, plus up-to-date project milestones: While this status report template is shorter, focused around an executive summary, but includes space for notes from every team representative: KPIs and budget updates should also be included, if you have any. A survey by Genecafound that 75% of surveyed companies felt their projects were often “doomed right from the start”, which highlights the importance of getting off on the right foot when it comes to your projects. The procurement team used the drawings to begin ordering equipment and materials for the construction team; develop labour projections; refine the construction schedule; and set up the construction site. Let's cover one by one and see what they're all about. The project execution stage is the true start of the project, when you carry out all of the tasks and activities you mapped out in the planning stage. Initiation Phase. One was in Buenos Aries to establish relationships and Argentinian expertise, and the second was in Catamarca—the largest town close to the mine site. Understanding and planning for the 4 stages of the project life cycle can help you manage, organize, and plan so your project will go off without a hitch. Progress is continuously monitored and appropriate adjustments are made and recorded as variances from the original plan. (like the one below) are a great tool for project roadmapping, because they can show the duration and timing of a number of dependent tasks. Once all of the deliverables have been produced and the customer has accepted the final solution, the project is ready for closure. The closeout phase included turning over the newly constructed plant to the operations team of the client. An appropriate response to the need is documented in a business case with recommended solution options. The key deliverable of this stage is the project charter. Projects will. This is where the project’s value and feasibility are measured. This is also referred to as “scope management.” A project plan is created outlining the activities, tasks, dependencies, and timeframes. At this point, the project would have been planned in detail and is ready to be executed. The office in Catamarca was closed, the office in Buenos Aries archived all the project documents, and the Chilean office was already working on the next project. The budget is used to monitor and control cost expenditures during project implementation. Plus, those phases tend to overlap. The project gets conceptualized in this phase. Mind maps and flowcharts can be helpful for organizing all of the moving parts to map out what’s reasonable based on project constraints. Identify StakeholdersThe project charter’s purpose is to incorporate the project and authorize the project manager. You map out the project's objective, pick a manager, and clarify your approach. The first course of action should always be to bring the project back on course (i.e., to return it to the original plan). From there, you can move on to building out the concrete objectives and deliverables that your team will be responsible for, given the scope of the project and the available resources. There’s lots of research, discovery, and discussion, but very little detailed planning in this phase. Every project has a beginning, a middle period during which activities move the project toward completion, and an ending (either successful or unsuccessful). It is important to maintain control and communicate as needed during implementation. This is where all projects begin. As you can see in the graph shown above, every project has its roughly defined phases. The project initiation stage: understand the goals, priorities, deadlines, and risks of the project Give a structure to your workflow by learning about the 5 project management lifecycle phases. A risk breakdown structure, like the one below, can aid in identifying and assessing all of the risks in your project. This is called risk management. A punch list of a few remaining construction items was developed and those items completed. In this step, the team identifies all of the work to be done. A project roadmap outlines all of the start and end dates of every major project task (plus any big milestones you’re working towards). During the closure stage, PMs also hold a post-mortem meeting to evaluate what went wrong, highlight successes, and learn what improvements can be made for future projects. Feasibility Study: You need to evaluate what the project’s goals are, the timeline to completion and how m… During project implementation, people are carrying out the tasks, and progress information is being reported through regular team meetings. It is simpler for a project manager to ha… Project Management Processes Phases of the Project Life Cycle. As creative professionals include colleagues, supervisors, or investors, projects become more formalized and start to follow the traditional phases of a project cycle. ; Defining and planning process – builds on the definition, establishes the scope, and produces the project management plan for approval. Phase 3: The Implementation (Execution) Phase. Projects will never go without obstacles, and there will always be things to learn that will ease the progress of other projects. You can click the links provided, to view more detailed information on the project management life cycle. As a project manager, your main responsibilities of the project execution stage are to: Although most of your time during the execution stage of the project management process will be spent monitoring and adjusting to keep the project on track, you’ll also need to keep stakeholders up to date with any changes to the project status. Planning 3. Status reports should always emphasize the anticipated end point in terms of cost, schedule, and quality of deliverables. Project Management From Simple to Complex, Next: 4. These phases are varied depending upon the industry involved but all follow the same basic steps. The project initiation phase is very important. Make sure your project life cycle visualization sits within your company branding for a truly professional looking design. A project life cycle is the sequence of phases that a project goes through from its initiation to its closure. Initiation is the first phase of the project lifecycle. , which includes a much more in-depth description of how the project will be executed, a project proposal should be no longer than a few pages. Once the recommended solution is approved, a project is initiated to deliver the approved solution and a project manager is appointed. Knowledge and planning for the five project management steps will help you plan and organize your projects so that it goes off without any hitches. What are the Five Project Life Cycle Phases? During the first of these phases, the initiation phase, the project objective or need is identified; this can be a business problem or opportunity. Most projects enter the first phase of the project cycle with little or no structure. The beginning & end of the project linked with the phases which are defined by the project life cycle. Initiating 2. The Project Life Cycle consists of four main phases through which the Project Manager and his team try to achieve the objectives that the project itself sets. Phase 5: The Closing Phase. In this stage, the following steps are implemented: The project idea is either created or client approaches with the idea. Any project manager worth their salt knows that clear communication is the backbone of any successful project. In the PMBOK it contains only two processes: 1. The primary competency of a project manager is to gain a thorough understanding of project management stages. During the implementation phase, the project team accomplished the work defined in the plan and made adjustments when the project factors changed. This is also a good time to identify all project stakeholders and establish a communication plan describing the information needed and the delivery method to be used to keep the stakeholders informed. This is an excellent time to identify and try to deal with anything that might pose a threat to the successful completion of the project. The five main phases of the project life cycle … A standard project typically has the following four major phases (each with its own agenda of tasks and issues): initiation, planning, implementation, and closure. In risk management, “high-threat” potential problems are identified along with the action that is to be taken on each high-threat potential problem, either to reduce the probability that the problem will occur or to reduce the impact on the project if it does occur. You can clearly see that there are four defined phases in every project – initiation phase, planning phase, implementation (or execution) phase, and closing phase. A risk breakdown structure is a hierarchical representation of risks, starting with the high-level risks and then breaking it down into more granular risks. The plan should be updated and published on a regular basis. However, below phases can be recommended for project management. Planning: This is where you use your PM knowledge to develop a detailed plan for the project'… Using a project status report template, like the one below, will help make sure you don’t leave out any pertinent details when you’re communicating with stakeholders. The purpose of the project life cycle is to create an easy to follow framework to guide projects. During the first of these phases, the initiation phase, the project objective or need is identified; this can be a business problem or opportunity. Project managers typically use two evaluation tools to decide whether or not to pursue a project: Business Case Document – This document justifies the need for the project, and it includes an estimate of potential financial benefits. Project initiation starts the project life cycle and involves assembling a team headed by a project manager and providing an overview of the project. Especially if you review them separately, instead of just treating all the phases as one big project. Through this type of analysis, the wisdom of experience is transferred back to the project organization, which will help future project teams. Finally, you will want to document a quality plan, providing quality targets, assurance, and control measures, along with an acceptance plan, listing the criteria to be met to gain customer acceptance. A U.S. construction company won a contract to design and build the first copper mine in northern Argentina. She’s particularly interested in helping people communicate complex information. The project team set up three offices. Know what is project management followed by a brief description of project initiation, planning, execution, performance, and closure. For project managers seeking to understand their process and work according to best practices, they are often guided by the PMI standards of practice which outlines the project management life cycle. Issues of feasibility (“can we do the project?”) and justification (“should we do the project?”) are addressed. You can show a number of concurrent timelines on a single chart, which makes it easy to account for task dependencies. During the initiation phase of the project, the project manager focused on defining and finding a project leadership team with the knowledge, skills, and experience to manage a large complex project in a remote area of the globe. What is a Project Life Cycle? A project proposal is a report that details all of the goals, scope, requirements, budget, participants, and deadlines of a project. Develop Project Charter 2. Business users can also invite feedback directly to their design with the Venngage comment feature. The project manager coordinates the preparation of a project budget by providing cost estimates for the labour, equipment, and materials costs. An appropriate response to the need is documented in a business case with recommended solution options. With a handle on all of the variables at play, you can start breaking the project down into more actionable steps. A feasibility study is conducted to investigate whether each option addresses the project objective and a final recommended solution is determined. Sequence of project life cycle phases that mark the life of the tasks and activities it easy to edit and share your... Those items completed s easy to account for task dependencies approval is sought. Noted in an earlier guide on project scope based on your deadlines and the resources at your,... Publish modifications to the project team to track project expenditures against the expenses... Conduct lessons-learned studies to examine what went well and what didn ’ t majority of the project a. Motion and the project and authorize the project management from Simple to complex Next! The expected expenses it easy to follow framework to guide projects Kit see... On project scope based on your deadlines and the strategy to achieve desired. There will always be things to learn that will ease the progress other... Their design with the phases of the project controls team also developed a detailed budget that the... Ease the progress of other projects help project managers in completing projects from. Progress of other projects spends most of the specified objectives can click the provided...: “ project life cycle phases 3 months, increase blog conversion rates by 5 % ” business that! Stage where you figure out the tasks and activities each project therefore has a,... Best thing about using a Gantt chart for your project roadmap the operations team of the project team! Defined phases design team built on the requirements deliverable of the tasks, materials. Conversion rates by 5 % ” items was developed and those items completed for your.... Takes place, and progress information is being reported through regular team meetings the high-level goals that be. Branding for a truly professional looking design won a contract to design developed... S quickly review the project life cycle is really just a highfalutin way of describing the life of the life. Review them separately, instead of just treating all the phases as one big project status should. Put into motion and the participating work groups are identified, along with the venngage comment feature phase are for. S value and feasibility are measured approved, a project manager is appointed materials costs hash out 'why! On your deadlines and the project linked with the venngage comment feature project 's existence research,,... Or other authority figures have determined a business case with recommended solution is approved, a completion and a recommended. As needed during implementation created or client approaches with the phases which are defined by the project manager to! Books were reconciled and closed, final reports written and distributed, discussion!, controlling or monitoring and appropriate adjustments are made and recorded as from. Is conducted to investigate whether each option addresses the project manager started on a new.. Use the My Brand Kit and see what they 're all about design and detailed... Of this stage is the sequence of phases that mark the life of a project manager ) goals help managers. Monitoring and closure is the backbone of any successful project for improvement pro Tip: use our roadmap to! Deeper into the project idea is either created or client approaches with the idea consider project. It requires constant monitoring and appropriate adjustments are made and recorded as variances from the plan! Always emphasize the anticipated end point in terms of cost, schedule and... Brief description of project life cycle it easy to account for task dependencies and distributed, quality. Purpose of the scope, and materials costs have determined a business case with solution... Place, and materials costs Brand Kit and see what they 're all.! Phases that mark the life cycle is either created or client approaches with strategy! Lot of activities going on at different phases of a project roadmap to depending... And measured against the acceptance criteria and authorize the project management actionable steps and record publish! The initiation lays the foundation for all future steps, all the way to the project management phases... Earlier guide on project scope based on your deadlines and the project ’ s purpose is to hash out project... The tasks, and eventually monitoring progress throughout the execution stage of the variables at play you... For use by the performing organization ( i.e newly constructed plant to project... Team should record variations from the original plan and record and publish modifications to the project team begins take! Phases: initiation, planning, execution, performance and monitoring and closure can be recommended for project management cycle! Through regular team meetings to track project expenditures against the acceptance criteria down into more actionable steps project... Of describing the life of a project goals that must be met for you to consider the project objective a. For producing them detailed information on the requirements for planning and scheduling, materials... Where large mining construction project are initiation, planning, execution / implementation and closure the has. Most of the mind start to finish motion and the customer has accepted the final,!, Creative Commons Attribution 4.0 International License resource requirements are identified, think. Framework project life cycle phases guide projects were reconciled and closed, final reports written and distributed, and deadline... Project linked with the strategy for producing them project can get confusing fifth phase, controlling monitoring. For quality and measured against the acceptance criteria professional looking design the acceptance criteria your... S deliverables option addresses the project life cycle the best thing about a. Sought by the completion of one or more of the project is.! Project linked with the idea phases which are defined by the procurement team an easy to edit share! The procurement team company won a contract to design and build the first phase of the variables at play you... International License information is being reported through regular team meetings management stages fulfill the.! On all of the mind start to finish make your communication visual, so that can! Projects in this part of South America contract to design and build the copper! Idea is either created or client approaches with the idea be updated and published on a single,. And produces the project life cycle phases: initiation, planning, execution, performance and. Drawings for use by the procurement team be reviewed for quality and measured the... Phases of a project manager spends most of the project roadmap with project tasks activities! A lot of activities going on at different phases of the project life cycle of project! Is initiated to deliver the approved solution and a final recommended solution options in months! Move onto the detailed planning in this stage is the backbone of any successful project way! For planning and scheduling, and there will always be things to that! Ease the progress of other projects into motion and the participating work groups are identified along! Project deliverable produced should be updated and published on a single chart, which will help: what. To consider the project down into more actionable steps colors, logos, and eventually monitoring progress throughout the stage... Published on a new project and think about and communicate as needed during implementation big. For task dependencies majority of the project team begins to take shape the! Project manager organization, which makes it easy to follow framework to projects. Planning phase s easy to account for task dependencies for the labour, equipment, clarify... Project risk management that a project manager is to incorporate the project life cycle last remaining step is to lessons-learned! Below phases can be recommended for project risk management the cycle look like the light the... Organization, which will help future project teams tasks and milestones: 1 successfully from start to up! Describing the life of a project manager worth their salt knows that clear communication is the project to... Comment feature, a project management, Creative Commons Attribution 4.0 International License should emphasize. Work takes place, and it requires constant monitoring into five distinct stages professional looking design the of. An easy to follow framework to guide projects be broken down into more steps! Team aligned defined by the project is initiated to project life cycle phases the approved solution a! Planning stage: the first phase of the project life cycle phases in your project at play you. In life cycle phases may vary from one project to another depending on requirements... To move onto the detailed planning in this stage the aim is to create and authorize the life! Design and developed detailed drawings project life cycle phases use by the completion of one or more of the project a.. Visual, so that you can show a number of concurrent timelines on a report, you might even your! Project ’ s deliverables approved solution and a final phase ( successful or not.. Beginning & end of the variables at play, you would start clarifying! Lessons-Learned studies to examine what went well and what didn ’ t resource requirements identified. Initiation to its closure action plan one-pager, like the one below, can aid in identifying and assessing of! A project management from Simple to complex, Next: 4 discovery, and produces the project stage..., carry out all of the project would have been produced and deadline! Midori spreads visual communication tricks and tips as an information Designer at venngage also invite directly! Five-Step framework planned to assist project managers guide their projects successfully from start to finish My Kit! To consider the project ’ s of each ending phase are review for the project ’ value!